
PROJECT RW-708 · BEDFORD PARK, IL · OPEN 24/7/365
Freight rework in Chicago, drawn up and done right.
Loads that showed up crooked, crushed or half wrapped get torn down and built back to spec at our Bedford Park dock. Restacked, repalletized, rewrapped, strapped and ready to ship.
Nights, weekends, holidays. The dock never closes.
01 Scope of work
| Item | Work | Sheet |
|---|---|---|
| RW-1 | Freight rework. Tear down a bad pallet, sort the cases, build it back on a solid base. | A-01 |
| RW-2 | Restacks and rewraps. Shifted and leaning stacks squared up, filmed and strapped. | A-02 |
| RW-3 | Damaged freight. Crushed and wet product separated from clean product. | A-03 |
| RW-4 | Crossdock and transload. Trailer to trailer, 40ft container to trailer, LTL and FTL. | A-04 |
| RW-5 | Storage. Warehouse floor space and running reefer trailers on the yard. | A-05 |
02 As found, in progress, as built



Before, during and after. Real photos from our dock.
03 Revision log: how a job runs
- REV A
Call it in
Tell us what's on the trailer and what's wrong with it. Photos speed things up.
- REV B
Dock it
The trailer backs into a door in Bedford Park, day or night.
- REV C
Tear down
Bad pallets come apart. Cases get checked and sorted.
- REV D
Build back
Stacked square on good pallets, wrapped in new film, corner boards and straps where needed.
- REV E
Release
Reloaded, crossdocked onto another truck, or held in storage until it ships.