DETAIL A-04
Crossdock and transload off the same dock
Rework is one piece. Freight moves through this dock every hour of every day.
In one door, out the other.
| Item | Work |
|---|---|
| XD-1 | Crossdock. Inbound trailer to outbound trailer with no long sit in between. |
| XD-2 | Transloading. Ocean containers, 40ft included, unloaded and loaded onto over-the-road trailers. |
| XD-3 | LTL. Full loads broken into partials, or partials consolidated into one trailer. |
| XD-4 | FTL. Whole truckloads moved trailer to trailer. |
| XD-5 | Rework on the way through. Restack, rewrap or repalletize before it leaves. |


